What goes into a Para floor
Tools can be rented. Craftsmanship and certification have to be earned.

Sourcing
We work closely with local certified mills, so the wood in your floor comes from an ethical and environmentally conscious process.

Subfloor preparation
A floor can only be as flat and as quiet as what lies beneath it, so this is where the work begins.

Acclimation
Wood moves with moisture. Boards and house come into balance before anything goes down.

Sanding passes
Each pass removes the marks of the last. Raking light is what shows whether a pass was rushed.

Finish systems
Color, sheen and protection are chosen together, from custom finishes to penetrating oils, on samples in your own light.

Detail work
Borders, transitions, vents and stairs get the same hands as the open floor.

Warranty backing
Material manufacturers underwrite our projects, so there is more behind your floor than our word.
What the trade's own guidelines ask
We are NWFA certified for installation and for sand and finish. These are a few of the association's published standards.
- Flat
- NWFA guidelines set flatness tolerances for the subfloor, as tight as 1/8 inch in 6 feet depending on the product and method.
- Dry
- For solid plank three inches and wider, a wood subfloor should be within 2% of the flooring’s moisture content.
- Smooth
- Sand through the grits, skipping no more than one between cuts.
- Clean
- Sanding marks that show from a standing position and spoil the look are unacceptable.

We work with materials from Bona, Loba-Wakol, Pallmann, Stauf, DuraSeal and Odie's Oil.
What shapes the price
Every project is priced on its own, because every floor differs. These are the things that move the number most.
- The floor beneath
- What the subfloor needs before any wood goes down.
- The wood
- Species, grade and board width.
- The design
- A straight plank and a star medallion are different jobs.
- The finish
- How many samples, which system, how many coats.
- The house
- Occupied or empty, stairs, access and timing.